home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V13_4 / V13_466.ZIP / V13_466
Internet Message Format  |  1991-06-28  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from hogtown.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/wc5wSB:00WBw42uU53>;
  5.           Fri, 26 Apr 91 02:24:13 -0400 (EDT)
  6. Message-ID: <sc5wS7m00WBwA2sk4E@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Fri, 26 Apr 91 02:24:08 -0400 (EDT)
  12. Subject: SPACE Digest V13 #466
  13.  
  14. SPACE Digest                                     Volume 13 : Issue 466
  15.  
  16. Today's Topics:
  17.           Re: Energia (was Re: Saturn V blueprints)
  18.                Re: Saturn V blueprints
  19.                Space Camp info
  20.        slight problems with HLV's in general, Saturn or not...
  21.           Re: Government vs. Commercial R&D
  22.                Re: Saturn V blueprints
  23.           Re: Atlas Centaur bites the big one, 4/18
  24.  
  25. Administrivia:
  26.  
  27.     Submissions to the SPACE Digest/sci.space should be mailed to
  28.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  29.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  30.              tm2b+@andrew.cmu.edu
  31.  
  32. ----------------------------------------------------------------------
  33.  
  34. Date: 26 Apr 91 02:41:30 GMT
  35. From: agate!lightning.Berkeley.EDU!fcrary@ucbvax.Berkeley.EDU  (Frank Crary)
  36. Subject: Re: Energia (was Re: Saturn V blueprints)
  37.  
  38. In article <920@idacrd.UUCP> mac@idacrd.UUCP (Robert McGwier) writes:
  39. >> Federal law prohibits The Us Government ( including NASA ) 
  40. >> from purchasing launches on foreign launch vehicles.
  41. >You are incorrect.  There will be US built satellites launched on Long March's
  42. >sometime in the near future and there are now DOZENS of launches on
  43. >Arianes.  I have PERSONALLY built satellites in the US that were launched
  44. >on Ariane.
  45.  
  46. While US companies may launch on foreign launchers, and have, NASA (as
  47. part of the US government) may not.
  48.  
  49.                      Frank Crary
  50.                      UC Berkeley
  51.  
  52. ------------------------------
  53.  
  54. Date: 25 Apr 91 17:42:10 GMT
  55. From: snorkelwacker.mit.edu!usc!rpi!zaphod.mps.ohio-state.edu!samsung!umich!ox.com!hela!aws@apple.com  (Allen W. Sherzer)
  56. Subject: Re: Saturn V blueprints
  57.  
  58. In article <1991Apr25.151106.20938@zoo.toronto.edu> kcarroll@zoo.toronto.edu (Kieran A. Carroll) writes:
  59.  
  60. >I saw a show on PBS a few nights ago (may have been the McNeil/Lehrer
  61. >Newshour) talking about the ALS development and fly-off competition.
  62.                              ^^^
  63. I assume you mean ATF.
  64.  
  65. >It was indeed done under fixed price contracts, of about $600M
  66. >as I recall. However, apparently >both< prime contractors spent
  67. >more like $1B each on the project. I don't know about the schedule,
  68. >but they blew the budget significantly
  69.  
  70. No this is on budget as well as schedule. Unlike other fighter
  71. competitions this time the Air Force required significant buy
  72. in by the contractors. Both where expected to put up about half
  73. the development money. In fact, they may have come in a tad under
  74. budget.
  75.  
  76. Good engineers CAN estimate the cost of building things; even advanced
  77. products. 
  78.  
  79.   Allen
  80. -- 
  81. +-----------------------------------------------------------------------------+
  82. |Allen W. Sherzer | If you love something, let it go. If it doesn't come back |
  83. |   aws@iti.org   | to you, hunt it down and kill it.                         |
  84. +-----------------------------------------------------------------------------+
  85.  
  86. ------------------------------
  87.  
  88. Date: 25 Apr 91 20:19:19 GMT
  89. From: haven.umd.edu!cs.wvu.wvnet.edu!jdm@purdue.edu  (James D Mooney)
  90. Subject: Space Camp info
  91.  
  92. The following is a summary description of current U.S. Space Camp
  93. Programs, taken from the current brochure.  For further information
  94. or applications, please contact:
  95.  
  96.         U.S. Space Camp
  97.         One Tranquility Base
  98.         Huntsville, AL 35807-7015
  99.         1-205-837-3400
  100.  
  101.         RESERVATIONS:  1-800-63-SPACE
  102.  
  103.  
  104. My daughter makes the following comments:
  105.  
  106.     1.  The schedules are *highly* subject to change.
  107.  
  108.     2.  At Space Academy, expect a lot of lectures.
  109.     ___________________________________________________        
  110.  
  111. SPACE CAMP
  112.  
  113.     For children in (or just completed) grades 4,5, 6, or 7.
  114.  
  115.     Two locations: Huntsville AL and Cape Canaveral, FL.
  116.  
  117.     5 days (4 PM Sunday to 9AM Friday).  Programs most weeks
  118.     year-round.
  119.  
  120.     TUITION:  $425 to $550, depending on season
  121.  
  122.     SCHEDULE:
  123.  
  124.         ROCKETRY DAY: Tour rocket facilities, build model
  125.         rockets and learn about rocketry.
  126.  
  127.         ASTRONAUT TRAINING DAY:  Experience aspects of
  128.         astronaut training, including simulators, etc.
  129.  
  130.         MICROGRAVITY DAY:  Experience simulated
  131.         weightlessness; learn about robotics.
  132.  
  133.         MISSION DAY:  Plan and carry out a simulated
  134.         space shuttle flight.
  135.  
  136. SPACE ACADEMY (LEVEL I)
  137.  
  138.     For students in or just completed grades 7, 8, and 9.
  139.  
  140.     Five-day program (2PM Sunday to 9AM Friday) most weeks
  141.     year-round at Huntsville only.
  142.  
  143.     TUITION: $475 to $600, depending on season.
  144.  
  145.         SHUTTLE OPERATIONS DAY:  Learn space shuttle
  146.         operation using simulators.
  147.  
  148.         MISSION ASSIGNMENTS DAY:  Train for specific
  149.         missions.  Learn crew, science, and ground
  150.         responsibilities.  Study life support systems.
  151.     
  152.         MISSION EXPERIMENTS DAY:  Study for mission
  153.         experiments.  Learn satellite deployment, etc.
  154.  
  155.         MISSION DAY:  Conduct two simulated missions
  156.         in teams.  Conduct spacelab experiments and
  157.         simulated spacewalks.  Work with Hubble Space
  158.         Telescope simulator.
  159.  
  160. SPACE ACADEMY (LEVEL II)
  161.  
  162.     A program emphasizing academic foundations of aerospace
  163.     careers.  For students in or just completed grades
  164.     10, 11, and 12.
  165.  
  166.     "8-day" program (5PM Saturday to 1PM Saturday), most weekends
  167.     year-round, Huntsville only.
  168.  
  169.     TUITION:  $675.
  170.  
  171.     PROGRAM:  Based on student's choice of one of three "tracks:"
  172.  
  173.         TECHNOLOGY TRACK:  Design and conduct space
  174.         shuttle experiments;  instruction in solar
  175.         and space plasma physics, space biology, astrophysics,
  176.         fluids, materials, optics and computers.  Train
  177.         in SCUBA techniques in Underwater Astronaut
  178.         Trainer.
  179.  
  180.         ENGINEERING TRACK:  Study robotics, engineering fields,
  181.         materials and structures.  Train in SCUBA and
  182.         microgravity techniques.
  183.  
  184.         AEROSPACE TRACK:  Focus on educational requirements
  185.         for aerospace engineers.  Study celestial navigation,
  186.         meteorology, orbital mechanics, space piloting.
  187.  
  188. OTHER PROGRAMS:
  189.  
  190.     All of these are at Huntsville only.  Some are offered only
  191.     in summer months.
  192.  
  193.     AVIATION CHALLENGE (BASIC):  For grades 7,8, and 9.  Intended
  194.     for previous space camp attendees.  Focus on aviation
  195.     training.
  196.  
  197.     AVIATION CHALLENGE (INTERMEDIATE):  For grades 10, 11, 12.
  198.  
  199.     ADULT PROGRAMS:  Space Academy Level I or Aviation Challenge
  200.     (3 days) or Space Academy Level II (8 days).
  201.  
  202.     TEACHER PROGRAMS:  Two levels, 5 days each.  Academic credit
  203.     available.
  204.  
  205. --
  206. Jim Mooney                Dept. of Stat. & Computer Science
  207. (304) 293-3607                West Virginia University
  208.                     Morgantown, WV 26506
  209. INTERNET: jdm@a.cs.wvu.wvnet.edu
  210.  
  211. ------------------------------
  212.  
  213. Date: 25 Apr 91 22:31:50 GMT
  214. From: usc!sdd.hp.com!samsung!rex!rouge!pc.usl.edu!dlbres10@apple.com  (Phil Fraering)
  215. Subject: slight problems with HLV's in general, Saturn or not...
  216.  
  217. Anyway, while the whole net (at least it seems) is arguing about the
  218. merits of adopting the Saturn V (or a Saturn VI) as this nation's
  219. heavy lift launch vehicle, I would like to bring up a different
  220. question, a meta-question as it were.
  221.  
  222. Or rather, I would like to bring it up again, I've brought it up often
  223. enough in the past.
  224.  
  225. Is a heavy-lift launch vehicle really needed? The vast majority of
  226. commercial payloads are rather small compared to the payloads of the
  227. large vehicles being developed, and I suspect that it would be easy to
  228. break up the larger payloads into smaller payloads assembled on-site
  229. if the smaller vehicle proved cheaper.
  230.  
  231. Especially if new technology is going to be developed, it would be
  232. easier to develop it on a small test vehicle; also, a launch failure
  233. on a vehicle carrying 10,000 pounds (a figure I picked because I'm
  234. pretty sure none of the proposed small vehicles use it as their
  235. figure) would be much less disastrous than losing several payloads
  236. packed into a 100,000 lbs. payload bus. If the payload on the smaller
  237. vehicle is a part of a larger payload, then only the part need be
  238. replaced, not the whole vehicle. As (I think, but don't quote me on
  239. this) Dee Ann Divis pointed out once, the insurance for the heavy
  240. launcher is going to be a lot more than for the light launcher,
  241. because more is risked each launch.
  242.  
  243. Or consider the case where the small and large launcher are equally
  244. reusable or expendable (whatever configuration the vehicle is). The
  245. assembly line for the large vehicle is going to be physically larger
  246. _and_ amortizes its cost over a much smaller number of vehicles for
  247. launching the same payload. Also, the "learning curve" (which I don't
  248. understand in the strict engineering sense, I only have a layman's
  249. grasp of the meaning of the term) may prove a factor: by the time five
  250. launches (arbitrarily picked number, again) is finished and design and
  251. operating changes are made in order that the vehicle only costs twice
  252. as much as it was sold to Congress on :-) 50,000 pounds is launched
  253. with the small booster, while for the 100,000 pound model 500,000
  254. pounds has been launched, (probrably all of several projects) and for
  255. the 600,000 pound class booster, things only get worse.
  256.  
  257. Finally, most of the grandiose projects these boosters are being
  258. proposed for _can_ probrably be broken up into smaller packages and
  259. assembled on orbit, or have a very large mass fraction in the forms of
  260. provisions and fuel, which doesn't really care about being launched in
  261. a large number of small lots rather than one large one... besides, the
  262. reason many of the payloads weigh as much as they do is that they're
  263. designed for a specific launch vehicle like the shuttle. With a
  264. smaller vehicle the module sizes would be smaller, and so on.
  265.  
  266. Besides, trying to build an experimental vehicle to lower launch costs
  267. the size of the proposed ALS is tempting fate, IMHO. To bring up the
  268. old airliner analogy, it would be better to develop and test the idea
  269. of cheap jet engines on a smaller vehicle before strapping them under
  270. the wing of an experimental 747; and what's more, imagine that said
  271. 747 has no predecessor like the 707, but the piston-powered Spruce
  272. Goose, and the analogy becomes more accurate.
  273.  
  274. -- 
  275. Phil Fraering
  276. dlbres10@pc.usl.edu
  277. Joke going around: "How many country music singers does it take to
  278. change a light bulb? Four. One to change the bulb, and three to sing
  279.  
  280. ------------------------------
  281.  
  282. Date: 26 Apr 91 00:11:15 GMT
  283. From: sun-barr!ccut!wnoc-tyo-news!astemgw!kuis!rins!will@apple.com  (will)
  284. Subject: Re: Government vs. Commercial R&D
  285.  
  286. In article <27156@hydra.gatech.EDU>, ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  287. >Sounds like the Japanese aren't nearly as smart as people seem to give them
  288. >credit for.  This is the same media that claims the Japanese people are from
  289. >Mars, right?
  290. >
  291. >Sounds like the seeds of Japanese decline are starting to sprout...
  292. >
  293.  
  294.     Actually it is kind of funny that you say that.  Cliff are you there?
  295. If you turn on the T.V. (I think either 6 or 7 am here), then they have a 
  296. special show on America.  Now, this show has been dubed by the Japanese
  297. press as "Look at the stupid Americans show".  They only portray the worst of
  298. America, and make it look like a dieseased country.  One reason, at least in my
  299. opion that this anti-American propaganda is being showed is because many of the
  300. women here are getting out of japan, mostly to Americans that live or travel
  301. here.  In fact, "Cliff you may want to add something here", you can go to just
  302. about any japanese girl that speaks english here and ask, why do you like
  303. foregners?  And vertually all of them will say that they are better than the
  304. Japanese counter-part.
  305.  
  306.     In fact I once took a shinkansen to Tokyo and I happen to set by a very
  307. lovly young lady.  She could have anyone of her she choice,  she asked me to
  308. marry her and take her to America.  I asked her why.  And she said, she hates
  309. Japan and hates japanese people and just wants to get out.  And the more I talk
  310. to these girls, the more they want to leave.  She is now married to my friend
  311. and lives in the States and enjoys her life much more now.  But it is not an
  312. isolated case.  In fact many girls have even told me that if their company ever
  313. found out that they had foreign boy-friends, then they would be fired the same
  314. day, because their company believes that the place of a women is with the male
  315. counter-parts that work for that company.  In fact many companys try to force
  316. the match-up of japanese women to the males in that company, even to the point
  317. of rape.  Which after that the girl is forced to leave that company, because
  318. of the imbarasment.  There is no legal recourse for the girl, because if she
  319. try's to say something, then her next employer will find out and not hire her.
  320.  
  321.     By the way, Japan has had a 3 year record high in high-school drop-outs
  322. and teenage suicides, and teachers murdering students.
  323.  
  324.     Since this has nothing to do with space, but I think is of general
  325. interest.  I will not follow up to this.
  326.  
  327.                         Will.
  328.  
  329. ------------------------------
  330.  
  331. Date: 26 Apr 91 03:33:20 GMT
  332. From: olivea!samsung!usc!rpi!mvk@apple.com  (Michael V. Kent)
  333. Subject: Re: Saturn V blueprints
  334.  
  335. In article <1991Apr25.151106.20938@zoo.toronto.edu> kcarroll@zoo.toronto.edu (Kieran A. Carroll) writes:
  336. >This doesn't necessaarily reflect on the management of the programs, 
  337. >by the way. It >may< have been a calculated business risk.
  338. >Both companies would likely have been willing to take this risk,
  339. >given the size of the production contract that they stood to win
  340. >if their design was chosen by the USAF. So, the loser has to swallow
  341. >a $400M marketing cost... 
  342.  
  343. I don't have anything to do with the ATF, but from what I have read, I think
  344. you are right.  The ATF competition was designed that way.  Winner wins big.
  345. Loser loses big.  Of course I have no official knowledge of any of this.
  346.  
  347. We (the govt.) could issue a contract for more Saturn V's, but we would have
  348. to make sure there are approriate safety measures in place.  After all, what
  349. good are a few Saturn V's if half of our aerospace industry goes backrupt to
  350. produce them?
  351.  
  352. Mike                                                mvk@itsgw.rpi.edu
  353.  
  354. ------------------------------
  355.  
  356. Date: 25 Apr 91 14:57:17 GMT
  357. From: usc!zaphod.mps.ohio-state.edu!caen!ox.com!hela!aws@apple.com  (Allen W. Sherzer)
  358. Subject: Re: Atlas Centaur bites the big one, 4/18
  359.  
  360. In article <1991Apr25.082413.1@vf.jsc.nasa.gov> kent@vf.jsc.nasa.gov writes:
  361. >> We already know. Their approach is to use what works and to improve it step
  362. >> wise as time goes on...
  363.  
  364. >I disagree with you.  The Russian protron booster has a launch success
  365. >percentage LOWER than any US booster.  
  366.  
  367. I was thinking of the Soyuz launcher which has reliability much higher than
  368. anything we fly.
  369.  
  370. >I do not have the specific figures, but
  371. >our boosters: Atlas, Delta, Titan, Saturn, Shuttle  have launch successes in
  372. >the high 90's.  The Russian boosters are in the low 90's
  373.  
  374. It depends. Over the entier lifetime of the launchers ours are also in
  375. the low 90's. Recently ours have become ~98% reliable. I don't know what
  376. their recent history is but I would be suprised to see it was that bad.
  377.  
  378. >The Atlas has been in continous use for over 25 years.  The titan was developed
  379. >in the 1960's and has been continously improved over the years.
  380.  
  381. And I would consider them something we have done (by and large) right.
  382.  
  383. >All of our unmanned boosters have gone thru weight reduction programs,
  384. >component replacement programs (new parts to replace ones that are not
  385. >available any more), and major upgrades. 
  386.  
  387. Indeed they have. Over time the current Delta bears little resembelance
  388. to it's 30 year old ancestors. This is why they have high reliability
  389. and low cost compared to the Shuttle. Our problems arise because we
  390. insist on throwing this away for untried technology. If Chalanger hadn't
  391. failed, we might not have Delta's or Atlas's today.
  392.  
  393. >In my opinion, NASA was faced with the undesireable choice of continuing the
  394. >Saturn 5 or developing the Shuttle.  I think NASA made the right decision.
  395.  
  396. Why?
  397.  
  398.   Allen
  399. -- 
  400. +-----------------------------------------------------------------------------+
  401. |Allen W. Sherzer | If you love something, let it go. If it doesn't come back |
  402. |   aws@iti.org   | to you, hunt it down and kill it.                         |
  403. +-----------------------------------------------------------------------------+
  404.  
  405. ------------------------------
  406.  
  407. End of SPACE Digest V13 #466
  408. *******************
  409.